FRONTIER MINES CANADA INC. AT OPERATION IN SOUTH AMERICA. A HIGH GRADE GOLD TURN-KEY PROJECT, ORDERED BY FRONTIER VENTURES INTER. INC. AN USA CORPORATION. BELLOW SOME DETAILS OF THAT MEGA OPERATION: |
Surveyor Team Confirming Concession Limits |
Localized Corners and Official Limits |
Putting Intermediates Marks in the Trails |
Location of Geodesics Reference Points |
Field Frontier’s Team Ready to Work |
International Inspector Visiting the Mine |
Taking Samples for Geochemistry Assaying |
International Geologists Checking Mineralization |
International Visitor Browsing over Pos. 47 |
Our best assay results on the table at Pos. 47 |
Visitors at our Control Gate |
Frontier’s Staff at Toronto 2007 |
Frontier’s Staff Checking Equipments at Toronto |
Frontier’s Staff Visiting Toronto |
Up to Date Mining Equipment in Toronto PDAC2007 |
Mineralization (Cooper pyrite), Eagle Project Pos. 100 |
Mineralization – Eagle Project – Pos. 109 |
Mineralization, Puma Project, Alterated Pyrite- Pos. 37 |
With Errol Checking Alterated Quartz Vein at Pos. 37 |
Carbomatic Quartz Vein Intruding Granite – Pos. 59 |
Alterated Cooper Pyrite at Pos. 59 |
Measuring Big Mineralized Quartz Vein at Pos. 9 |
General Overview of Electrostatic Concentrator |
Electrostatic Dry Concentrator |
Pilot Project: Electrostatic Concentrator |
Pilot Project: Assembling Concentrator Electrodes |
Dry Micronizer Mill |
Side View of Micronizer Mill |
Pilot Program: Hightec Mineral Concentrator |
Detail of Bags Filter |
A High Tension Transformer Feeding our Concentrator |
Gravimetric Concentrator |
Hammer Mill and Trommel |
Hammer Mill, Side View |
Cyanide Recovery Unit |
Cyanide Extraction Unit |
Dry Hammer Mill Assembled |
Primary Chemical Reactor |
Chain Micronizer Mill |
Side View of Processing Plant |
Pilot Plant to Frontier Mining do Brasil |
Centrifuge Filtering System |
Dynamic Recovery and Absorption Cells |
Wastes Recovery System – Housing Machine |
Portable Houses, processing our wastes |
Environment Solution – Processing 100% of Wastes |
Housing Machine, inside view |
Housing Machine Processing Mineral Tailings |
Inside View of the Wasting Processing Plant |
Top View |
Opposite View |
Building a Control Gate to the Mine |
Sending Samples to Tucson, AZ |
High-grade Gold Mineralization – Pos. 37 |
Schist’s Mineralization at Pos. 82 |
Alkaline Rock, at Pos. 114 |
Graphite Schist’s at Pos. 106 |
Mineralized Schist’s at Pos. 108 |
Carbomatic Quartz Vein Intruding Granite Pos. 59 |
Cooper Sulfide from Cooper Pyrite at Pos. 59 |
Mineralization inside big Vein of Pos. 9 |
Mineralized Schist’s found at Pos. 82 |
Typical Pyrite Mineralization inside Quartz Matrix |
Pyrite: Our Richiest Gold Material, 549 PPM |
Pyrite: Iron Hydroxide Sulfide with Gold |
Inside Extructure of the Gold Ore – Pyrite & Fractures |
Gold Leaching: See Visible Gold Crystals Pos. 37 |
Frontier Mining do Brasil: Pilot Research Center |
Frontier Mining do Brasil: Pilot Plant |
Frontier Mining do Brasil: Pilot Plant |
Frontier Mining do Brasil: Pilot Plant |
Micronizer Mill |
Gold Recovery Units |
kinross Operation in Paracatu, same mineralization |
Discovering Mineralization at Complex 37 |
An old Volcano, changed our Mineralization |
Pyrite Sample, high-grade gold mineralization |
Alterated Pyrite, also high-grade mineralization |
Pyrite intruding quartz veins – Pos. 26 |
Cooper Pyrite – High Grade Gold |
Cooper Pyrite – Alteration to reddish color |
Cooper Pyrite Changing do Red (see pict. 118) |
Visible Gold Crystals Seen at this Sample |
Mineralized Schist’s appears at Creek, Pos. 108 |
Hydraulic Jig for the Gravimetric Concentration |
Milimetric Adjustment Device, Applied to the Jig |
Gold Shown at Pyrite Micrograph |
Micrograph - Cooper Pyrite with Gold, Intruding Pyrite |
Red Water Driving Us to Pyrite Veins (see Pos.116) |
Mineralized Schist’s - Detail at Pos. 82 |